BidTron logo BidTron
Login Register

AZ

PROFESSIONAL ENGINEERING SERVICES FOR RESERVOIR & STORAGE TANK REHABILITATION PROGRAM

City of Tucson

Score: 49 Validated: yes
Published
2026-03-27
Due
2026-04-17
Contact
Category flags
None

Summary

The City of Tucson is conducting a competitive ONE-STEP process to retain ONE (1) CONSULTANT to provide professional engineering services for Tucson Water Reservoir and Storage Tank Rehabilitation Program . Tucson Water operates 60 potable and reclaimed water storage facilities, including concrete reservoirs and steel tanks, with a total capacity exceeding 335 million gallons. These facilities, valued at over $200 million, are critical assets within the City’s water delivery system. Most reservoirs and tanks were constructed between 1980 and the mid-1990s, with some concrete facilities dating back 50 to 70 years. While periodic maintenance and diving inspections have been performed in the past, Tucson Water has formalized these efforts through the Reservoir Rehabilitation Program to ensure systematic evaluation, rehabilitation, and preservation of these facilities. This contract will supplement and continue the work performed under the preceding contract agreements, supporting Tucson Water’s long-term strategy to maintain reliable water storage infrastructure and ensure uninterrupted service to the community. The purpose of this Request For Qualifications (RFQ) is to identify and select one qualified engineering consulting firm with demonstrated expertise in water storage facility evaluation, inspection, rehabilitation, and design. The selected firm will provide professional services that may include condition assessments, structural and coatings evaluations, rehabilitation design, construction documents, cost estimating, and construction support. Through this procurement, Tucson Water seeks a consulting partner that can deliver comprehensive, cost-effective, and technically sound solutions to extend the service life of its reservoirs and tanks, optimize operational performance, and protect the City’s long-term investment in critical water infrastructure.

AI Analysis

Validation: Hybrid score 49 (confidence 90)

Contract Type
Estimated Value
Bid Bond
Site Visit
Local Req
License
Construction
PLC Details
HMI/SCADA
Comms
Subcontractor
Pre-selected

Project insights

{
  "bid_bond_required": null,
  "captured_at": "2026-04-10T18:16:03.496861",
  "communication_details": null,
  "construction_beyond_panels": null,
  "contract_type": null,
  "estimated_project_value": null,
  "hmi_details": null,
  "integrators_already_selected": null,
  "integrators_required_local": null,
  "license_requirements": null,
  "mandatory_site_visit": null,
  "plc_details": null,
  "portal_name": "City of Tucson",
  "portal_state": null,
  "project_id": "240007",
  "raw_closing_date": "2026-04-17T21:00:00.000Z",
  "raw_posting_date": "2026-03-27T07:00:00.000Z",
  "requires_subcontractor": null,
  "source": "opengov",
  "source_type": "portal"
}

Related

Similar RFPs

Digital Master Controller PLC Replacement and Recommissioning - KHC

AZ · Score 64

View

Digital Master Controller PLC Replacement and Recommissioning - KHC

AZ · Score 64

View

WATER TREATMENT PLANT PRESSURE FILTER MEDIA REHABILITATION PROJECT

AZ · Score 60

View

West Wastewater Treatment Plant (WWTP) - West WWTP 3.0 MGD MBR

AZ · Score 60

View

Booster Pump Station 55A Design Project

AZ · Score 60

View