BidTron logo BidTron
Login Register

AZ

West Wastewater Treatment Plant (WWTP) - West WWTP 3.0 MGD MBR

Arizona Purchasing Group

Score: 60 Validated: yes
Published
2026-02-17
Due
2026-04-09
Contact
Category flags
Water/Wastewater, Mining

Summary

Construction project to upgrade and convert an existing 1.5 MGD SBR treatment process to a 3.0 MGD Membrane Bioreactor treatment process at a wastewater treatment plant, to be completed within 488 calendar days.

AI Analysis

Validation: Hybrid score 60 (confidence 86)

Contract Type
Estimated Value
Bid Bond
Site Visit
Local Req
License
Construction
Yes
PLC Details
HMI/SCADA
Comms
Subcontractor
Pre-selected

Project insights

{
  "bid_bond_required": null,
  "bidnet_family_member": false,
  "bidnet_family_size": 1,
  "bidnet_family_title": "West Wastewater Treatment Plant (WWTP) - West WWTP 3.0 MGD MBR",
  "communication_details": null,
  "construction_beyond_panels": true,
  "contract_type": null,
  "estimated_project_value": null,
  "hmi_details": null,
  "integrators_already_selected": null,
  "integrators_required_local": null,
  "license_requirements": null,
  "mandatory_site_visit": null,
  "plc_details": null,
  "portal_name": "Arizona Purchasing Group",
  "public_ai_overview_used": true,
  "requires_subcontractor": null,
  "source": "bidnet",
  "source_record_id": "443881649313"
}

Related

Similar RFPs

Digital Master Controller PLC Replacement and Recommissioning - KHC

AZ · Score 64

View

Digital Master Controller PLC Replacement and Recommissioning - KHC

AZ · Score 64

View

Booster Pump Station 55A Design Project

AZ · Score 60

View

WATER TREATMENT PLANT PRESSURE FILTER MEDIA REHABILITATION PROJECT

AZ · Score 60

View

LIFT STATION 66 AND LIFT STATION 77 WASTEWATER INFRASTRUCTURE MODIFICATIONS - CONSTRUCTION ADMINISTRATION AND INSPECTION SERVICES

AZ · Score 59

View