BidTron logo BidTron
Login Register

IA

Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station

W07V ENDIST ROCK ISLAND

Score: 60 Validated: yes
Published
2026-03-19
Due
2026-03-18
Contact
Category flags
None

Summary

Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station Solicitation W912EK26BA001 DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION MISSISSIPPI VALLEY.ENDIST ROCK ISLAND.W07V ENDIST ROCK ISLAND No Set aside used Y1QA 237990

AI Analysis

Validation: Hybrid score 60 (confidence 86)

Contract Type
Estimated Value
Bid Bond
Site Visit
Local Req
License
Construction
PLC Details
HMI/SCADA
Comms
Subcontractor
Pre-selected

Project insights

{
  "bid_bond_required": null,
  "captured_at": "2026-04-02T08:04:28.387402",
  "classification_code": "Y1QA",
  "communication_details": null,
  "construction_beyond_panels": null,
  "contract_type": null,
  "estimated_project_value": null,
  "hmi_details": null,
  "integrators_already_selected": null,
  "integrators_required_local": null,
  "license_requirements": null,
  "mandatory_site_visit": null,
  "naics_code": "237990",
  "notice_id": "8dc82354a0d94f88bf145a60969bbdef",
  "notice_type": "Solicitation",
  "organization_path": "DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION MISSISSIPPI VALLEY.ENDIST ROCK ISLAND.W07V ENDIST ROCK ISLAND",
  "plc_details": null,
  "requires_subcontractor": null,
  "set_aside": "No Set aside used",
  "solicitation_number": "W912EK26BA001",
  "source": "sam_gov"
}

Related

Similar RFPs

Bid Postings • Muscatine, IA • CivicEngage

IA · Score 55

View