BidTron logo BidTron
Login Register

MO

Z:\Carl Junction MO\City of Carl Junction\Stormwater\Briarbrook 2019 Ditch Improvements\Contracts\Cdocs and Specs\West Briarbrook Ln\CDocs\00 11 13

Carl Junction

Score: 3 Validated: yes
Published
2026-03-27
Due
Not listed
Contact
Category flags
None

Summary

Z:\Carl Junction MO\City of Carl Junction\Stormwater\Briarbrook 2019 Ditch Improvements\Contracts\Cdocs and Specs\West Briarbrook Ln\CDocs\00 11 13 Advertisement for Bids.docx 00 11 13 - 1 SECTION 00 11 13 – ADVERTISEMENT FOR BIDS Sealed Bids for West Briarbrook Lane Stormwater Drainage Ditch will be received by the City of Carl Junction, Missouri at Carl Junction City Hall, 303 N. Main St., Carl Junction, MO 64834, until 10:00 a.m. local time on November 13, 2024, at which time the Bids received will be publicly opened and read. The Work to be performed under the Base Bid provisions of this contract generally consists of the following: Construction of stormwater ditch improvements consisting of grading/shaping, installation of a vegetated concrete block mat, and seed & mulch. Bids shall be on a lump sum and unit price basis as described in the Bid Form. To obtain DIGITAL Plans and Specifications, please log on to www.amce.com, website for Allgeier, Martin and Associates, Inc., click on the tab marked “Plan Room” and insert Project Number 9361517. Digital download cost is $30.00 which may be paid online via a credit card. Hard copies of Plans and Specifications may be secured for a non-refundable fee in the amount of $60.00 per set, from the Issuing Office of Allgeier, Martin and Associates, Inc. at 7231 East 24th Street, Joplin, MO, Monday through Friday between the hours of 8:00 am and 5:00 pm or by telephone at 417.680.7200. If paying for hard copies by credit card, contact Cindy Olds at 417-680-7193. An additional processing fee of $10.00 shall apply to all credit card transactions. PLEASE NOTE: It is the sole responsibility of all planholders, whether or not they have received digital downloads or paper copies of the plans and specifications, to return to the Allgeier Martin website Plan Room ( www.amce.com) periodically to check for Addenda which may have been posted. Neither the Owner nor Engineer have any responsibility for the accuracy, completeness or sufficiency of bid information obtained from sources other than as indicated in these documents. Obtaining these documents from any other source(s) may result in incomplete and inaccurate information and may also result in failure to receive any addenda, corrections, or other revisions to these documents that may be issued and to be placed on the planholders list. Any bid received from a bidder whose name does not appear on the list of planholders at the office of Allgeier, Martin and Associates will be subject to rejection. Nondiscrimination in Employment: Bidders on this work will be required to comply with the President’s Executive Order Number 11246. Requirements for Bidders and Contractors under this order are explained in the specifications. The Owner reserves the right to waive any informalities or minor defects or to reject any or all bids and to readvertise and to rebid. Each Bidder must deposit with his bid, security in the amount of five percent (5%) of his base bid which is subject to conditions provided in the Instructions to Bidders. No Bidder may withdraw his bid within ninety (90) calendar days after the actual date of the opening thereof. Attention of the Bidder is particularly called to the requirements as to conditions of employment to be observed, and that the Bidder must comply with the payment of hourly wage rates, including all fringe benefits, as established by Section 290.210-340, RsMO, as amended in 1993, pertaining to the prevailing hourly rate of wages and including fringe benefits, as established by the Department of Labor and Industrial Relations of the State of Missouri. A copy of the determination is provided within the Supplemental General Conditions. Bidders with questions concerning this invitation may contact Michael Keaton, P.E., Allgeier, Martin & Associates, Inc., P. O. Box 2627, Joplin, Missouri 64803 (417) 680-7200. City of Carl Junction, Missouri Owner October 10, 2024 By Date Title: Steve Lawver, City Administrator END OF SECTION 00 11 13

Document text

Z:\Carl Junction MO\City of Carl Junction\Stormwater\Briarbrook 2019 Ditch Improvements\Contracts\Cdocs and Specs\West Briarbrook Ln\CDocs\00 11 13
Advertisement for Bids.docx
00 11 13 - 1
SECTION 00 11 13 – ADVERTISEMENT FOR BIDS
Sealed Bids for West Briarbrook Lane Stormwater Drainage Ditch will be received by the City of Carl Junction, Missouri at Carl
Junction City Hall, 303 N. Main St., Carl Junction, MO 64834, until 10:00 a.m. local time on November 13, 2024, at which time the
Bids received will be publicly opened and read.
The Work to be performed under the Base Bid provisions of this contract generally consists of the following:
Construction of stormwater ditch improvements consisting of grading/shaping, installation of a vegetated concrete block mat, and
seed & mulch.
Bids shall be on a lump sum and unit price basis as described in the Bid Form.
To obtain DIGITAL Plans and Specifications, please log on to www.amce.com, website for Allgeier, Martin and Associates, Inc.,
click on the tab marked “Plan Room” and insert Project Number 9361517. Digital download cost is $30.00 which may be paid
online via a credit card. Hard copies of Plans and Specifications may be secured for a non-refundable fee in the amount of $60.00
per set, from the Issuing Office of Allgeier, Martin and Associates, Inc. at 7231 East 24th Street, Joplin, MO, Monday through Friday
between the hours of 8:00 am and 5:00 pm or by telephone at 417.680.7200. If paying for hard copies by credit card, contact Cindy
Olds at 417-680-7193. An additional processing fee of $10.00 shall apply to all credit card transactions.
PLEASE NOTE: It is the sole responsibility of all planholders, whether or not they have received digital downloads or paper copies
of the plans and specifications, to return to the Allgeier Martin website Plan Room ( www.amce.com) periodically to check for
Addenda which may have been posted. Neither the Owner nor Engineer have any responsibility for the accuracy, completeness
or sufficiency of bid information obtained from sources other than as indicated in these documents. Obtaining these documents
from any other source(s) may result in incomplete and inaccurate information and may also result in failure to receive any addenda,
corrections, or other revisions to these documents that may be issued and to be placed on the planholders list. Any bid received
from a bidder whose name does not appear on the list of planholders at the office of Allgeier, Martin and Associates will be subject
to rejection.
Nondiscrimination in Employment: Bidders on this work will be required to comply with the President’s Executive Order Number
11246. Requirements for Bidders and Contractors under this order are explained in the specifications.
The Owner reserves the right to waive any informalities or minor defects or to reject any or all bids and to readvertise and to rebid.
Each Bidder must deposit with his bid, security in the amount of five percent (5%) of his base bid which is subject to conditions
provided in the Instructions to Bidders.
No Bidder may withdraw his bid within ninety (90) calendar days after the actual date of the opening thereof.
Attention of the Bidder is particularly called to the requirements as to conditions of employment to be observed, and that the Bidder
must comply with the payment of hourly wage rates, including all fringe benefits, as established by Section 290.210-340, RsMO,
as amended in 1993, pertaining to the prevailing hourly rate of wages and including fringe benefits, as established by the
Department of Labor and Industrial Relations of the State of Missouri. A copy of the determination is provided within the
Supplemental General Conditions.
Bidders with questions concerning this invitation may contact Michael Keaton, P.E., Allgeier, Martin & Associates, Inc., P. O. Box
2627, Joplin, Missouri 64803 (417) 680-7200.
 City of Carl Junction, Missouri
Owner
   October 10, 2024 By
         Date
Title: Steve Lawver, City Administrator
END OF SECTION 00 11 13

AI Analysis

Validation: Hybrid score 3 (confidence 100)

Contract Type
Estimated Value
Bid Bond
Site Visit
Local Req
License
Construction
PLC Details
HMI/SCADA
Comms
Subcontractor
Pre-selected

Related

Similar RFPs

Engineering Services Main Sanitary Lift Station Relocation and Expansion

MO · Score 60

View

Design Services for The Big Creek Excess Flow Holding and Pump Station Project

MO · Score 60

View

Construction of Cedar Glen Lift Station Improvements

MO · Score 60

View

Project 31214 - Westview Pump Station

MO · Score 60

View

Project 31214 - Westview Pump Station

MO · Score 60

View

Packages

Related Bid Packages