BidTron logo BidTron
Login Register

IL

BIDS WILL BE AWARDED ON 4-14-26 AND PRICE

Crossville

Score: 31 Validated: yes
Published
2026-03-27
Due
Not listed
Contact
Category flags
Mining

Summary

BIDS WILL BE AWARDED ON 4-14-26 AND PRICE CONTRACTS SENT AFTER APPROVAL. LOW BID DOES NOT GUARANTEE SELECTION. BULK COARSE SALT CRO #1683 3/20/2026 2 p.m. CDT Salt F.O.B. Salt Picked up Sodium Chloride F.O.B. Sodium Chloride Picked up Morton Salt Inc No bid No bid 149.36$ 149.00$ Compass Minerals No bid No bid No bid No bid Univar No bid No bid No bid No bid Dycho Company No bid No bid No bid No bid Water Treatment Chemicals CRO #1685 3/20/2026 2 p.m. CDT ZINC-ORTHO SODIUM SODIUM SODIUM NORIT VENDOR CAUSTIC CAUSTIC PHOSPHATE FLUROSILICIC BICARBONATE GRANULAR SALT COAGULANT PERMANGANATE THIOSULFATE PAC (GAL)-50% (GAL)-25% (GAL) ACID (GALLON) (POUND) BULK (POUND) (GALLON) Tote (GALLON) (POUND) Univar Solutions. 4.7574$ No bid No bid 3.9000$ 0.5920$ 0.1775$ No bid 10.4100$ 3.8730$ No bid Shannon Chemical Corp. No bid No bid 9.17$ No bid No bid No bid No bid 14.1400$ No bid No bid Carus Corporation No bid No bid 9.0200$ No bid No bid No bid No bid No bid No bid No bid Chemrite Inc No bid No bid 7.6500$ No bid No bid No bid No bid 10.4400$ No bid No bid Brenntag Mid-South 3.6000$ No bid 16.5000$ No bid 0.3499$ 0.1749$ No bid 13.6100$ No bid No bid Dycho Company Inc 3.7500$ No bid 9.4100$ 3.8800$ 0.3600$ 0.1775$ 4.4400$ 11.1000$ 3.4900$ 1.1800$ Hawkins Inc 3.5400$ No bid No bid 5.3700$ No bid No bid No bid 10.4400$ 8.2200$ No bid United Mineral No bid No bid No bid No bid No bid No bid No bid 13.7700$ No bid No bid Thermadyne No bid No bid No bid No bid No bid No bid 5.3850$ No bid No bid No bid ** LOOK AT THE BID FOR NOTES FROM BIDDER Fertilizer CRO #1686 3/20/2026 2 p.m. CDT Site One Landscape Supply - Knoxville Quantity Bag Ton 07/01/2026 Delivery LESCO 33-0-3 50% U-PLUS BIO 2Fe 50# 90 $28.5820 2,572.38$ (Alt. for 33-3-5 no longer available) -$ LESCO 32-0-8 40% NOS PLUS BIO 2Fe 50# 74 $28.8670 2,136.16$ (Alt. for 32-3-8) -$ Fertilizer/Insecticide 0-0-7 plus Acelepryn 0.067% 105 $37.6980 3,958.29$ LESCO 18-24-12 25% NOS PLUS BIO 50# 130 $29.5460 3,840.98$ (Alt. for 18-24-12 25% SCU) -$ 03/01/2027 Delivery -$ Dimension .15% 19-0-6 30% Polyplus LESCO 148 $31.8070 4,707.44$ (Alt. for 19-0-6 with .15 dimension) -$ 21-0-0 AS Mpac Compacted SGN 170 95 $34.5180 3,279.21$ Fertilizer/Insecticide 0-0-7 plus Acelepryn 0.067% 105 $37.6980 3,958.29$ 05/03/2027 Delivery -$ Dimension .15% 19-0-6 30% Polyplus LESCO 153 $31.8070 4,866.47$ (Alt. for 19-0-6 with .15 dimension) -$ Fertilizer 5-10-31 A/C with 10% FE 50 $16.1190 805.95$ LESCO 33-0-3 50% U-PLUS BIO 2Fe 50# 90 $28.5820 2,572.38$ (Alt. for 33-3-5 no longer available) 32,697.55$ The Hogan Company 7/1/2026 Quantity Bag Ton TFC MTO 35-3-5 FERTILIZER 50LB 90 $23.82 2,143.80$ TFC MTO 32-3-8 30% SCU 2% FE FERT. 50LB 74 $28.19 2,086.06$ Lebabon Pro 0-0-7 .067% Acelepryn MOP SNG 220 105 $36.88 3,872.40$ TFC MTO 18-24-12 Starter Fert. 25% SCU 130 $27.56 3,582.80$ 3/1/2027 Lebabon Pro 17-0-0 0.15% Dimension 50LB 148 $34.03 5,036.44$ 21-0-0 Ammonium Sulfate Fert. SGN 220 50LB 95 $20.06 1,905.70$ Lebabon Pro 0-0-7 .067% Acelepryn MOP SNG 220 105 $36.88 3,872.40$ 5/3/2027 Lebabon Pro 17-0-0 0.15% Dimension 50LB 153 $34.03 5,206.59$ TFC MTO 5-10-31 10% fe SNG 220 50LB 50 $23.50 1,175.00$ TFC MTO 35-3-5 FERTILIZER 50LB 90 $23.82 2,143.80$ TOTAL 31,024.99$ Pest Control CRO #1688 3/20/2026 2 p.m. Prices per Treatment Bug Busters Dodson Smithereen Pest City Hall 65.00$ 65.00$ 39.00$ Police Department 65.00$ 50.00$ 39.00$ Fire Department 65.00$ 55.00$ 39.00$ Recreational Buildings 65.00$ 55.00$ 39.00$ Palace Theater 65.00$ 55.00$ 39.00$ Crossville Depot 65.00$ 55.00$ 39.00$ WTP - 105 Holiday Drive 65.00$ 55.00$ 39.00$ WTP - 963 City Lake Rd 65.00$ 55.00$ 39.00$ Public Works: Maintenance Dept. and Bays 65.00$ 20.00$ 39.00$ Street Dept. and Kitchen 65.00$ 20.00$ 39.00$ Public Works Office and Kitchen 65.00$ 20.00$ 39.00$ Utilities Maintenance and Kitchen 65.00$ 20.00$ 39.00$ Fire Station #2 65.00$ 55.00$ 39.00$ Meadow Park Lake Office 65.00$ 55.00$ 39.00$ Airport Terminal Building 65.00$ 55.00$ 39.00$ Veolia 65.00$ 55.00$ 39.00$ Cemetery Building 65.00$ 55.00$ 39.00$ PD Impound Lot Buidling 65.00$ 55.00$ 39.00$ SEASONAL TREATMENTS: Centennial Park Concessions Buildings and Restrooms 65.00$ 55.00$ 39.00$ Meadow Park Lake Bath House 65.00$ 20.00$ 39.00$ Meadow Park Lake Maintenance Storage 65.00$ 20.00$ 39.00$ Duer Soccer Complex 65.00$ 55.00$ 39.00$ Garrison Park 65.00$ 55.00$ 39.00$ MONTHLY TOTAL 1,495.00$ 1,060.00$ 897.00$ Street Striping CRO #1689 3/20/2026 2 p.m. 4" line (per foot) 0.11$ 6" line (per foot) 0.16$ Thermoplastic: 24" Stop Bar (per foot) 15.00$ 12" crosswalk (per foot) 25.00$ Turn/straight arrows (each) 350.00$ 4" white or yellow line (per foot) 0.80$ Rumble strips (per foot) 8.00$ Word message (per letter) 35.00$ Cold Milling CRO #1690 3/20/2026 2 p.m. CDT Per ton to remove and retain millings Per ton for City to retain millings and have delivered Rogers Group 36.00$ 35.00$ Water Line Supplies CRO# 1684 3/20/2026 2 p.m. CDT Core & Main G&C Supply Co Consolidated Pipe & Supply Furguson Waterworks Fortiline Waterworks Saddles (Smith Blair) 2" x 3/4" cc 30.21$ 26.94$ 17.95$ 30.83$ 31.33$ 2" x 1" cc 30.21$ 26.94$ 17.95$ 31.49$ 31.33$ 3" x 3/4" cc 32.63$ 32.06$ 21.38$ 30.83$ 33.84$ 3" x 1" cc 32.63$ 32.06$ 21.38$ 38.00$ 33.84$ 3" x 2" I.P.T. 39.76$ 45.09$ 29.95$ 50.39$ 41.25$ 4" x 3/4" cc 41.71$ 36.38$ 30.15$ 39.64$ 40.10$ 4" x 1" cc 41.71$ 36.38$ 30.15$ 39.64$ 40.10$ 4" x 2" I.P.T. 44.44$ 47.48$ 39.35$ 53.21$ 46.10$ 6" x 3/4" cc 42.92$ 39.63$ 34.28$ 44.57$ 44.52$ 6" x 1" cc 42.92$ 39.63$ 34.28$ 44.57$ 44.52$ 6" x 2" I.P.T. 52.28$ 50.22$ 39.29$ 56.90$ 54.23$ 8" x 3/4" cc 46.98$ 50.85$ 43.98$ 50.22$ 48.67$ 8" x 1" cc 46.98$ 50.85$ 43.98$ 50.22$ 48.67$ 8" x 2" I.P.T. 58.62$ 62.82$ 47.98$ 69.42$ 60.81$ 10" x 3/4" cc 57.15$ 65.10$ 48.55$ 67.60$ 59.29$ 10" x 1" cc 57.15$ 65.10$ 47.37$ 67.60$ 59.29$ 10" x 2" I.P.T. 73.75$ 82.86$ 55.78$ 93.31$ 76.51$ 12" x 3/4" cc 61.34$ 78.08$ 52.57$ 85.43$ 62.97$ 12" x 1" cc 61.34$ 78.08$ 52.57$ 85.43$ 62.97$ 12" x 2" I.P.T. 77.74$ 97.50$ 65.63$ 110.29$ 79.81$ 14" x 3/4" cc 72.44$ 112.66$ 106.21$ 97.87$ 62.97$ 14" x 1" cc 72.44$ 112.66$ 106.21$ 99.93$ 62.97$ 14" x 2" I.P.T. 88.24$ 144.38$ 97.20$ 121.72$ 79.81$ 16" x 3/4" cc 85.98$ 114.19$ 109.08$ 118.60$ 88.27$ 16" x 1" cc 85.98$ 114.19$ 109.08$ 118.60$ 88.27$ 16" x 2" I.P.T. 106.50$ 156.47$ 110.60$ 146.91$ 109.35$ Encoder module with Itron 5' cable Part#965-110-66 No bid No bid 161.00$ No bid No bid Corp Stops (Ford) ¾” F1000-3-Q NL 38.40$ 42.06$ 37.15$ 42.99$ 33.86$ Corp Stops (Ford) ¾” FB1000-3-Q NL, 300 PSI 56.81$ 61.67$ 54.00$ 63.23$ 58.32$ Coupling for ¾” service tubing brass C44-33-Q CRSXCTS NL 21.44$ 23.27$ 20.75$ 23.98$ 22.01$ 3/4" PE Municipex CTS Service Tubing 500' coils (per ft) 1.02$ 465.00$ $ 440.00 (.88/ft) 424.13$ .77/ft 1" PE Municipex CTS Service Tubing 500' coil (per ft) 1.53$ 700.00$ $ 640.00 (1.28/ft) 615.79$ 1.16/ft Smith Blair 3/4" x 3" full circle clamp for service tubing 22.50$ 30.31$ 19.71$ 10.53$ No bid 18" plastic meter box (Carson-Brooks) plastic lid 53.21$ 61.33$ 57.45$ 48.95$ 58.00$ 3/4" Meter yokes (Ford) 7" rise 200.98$ 216.18$ 195.00$ 192.46$ 206.36$ Brass Saddles (Ford) 2" x 3/4" 24.10$ 26.40$ 30.29$ 27.49$ 25.00$ 2" x 1" 24.10$ 26.40$ 30.29$ 27.49$ 25.00$ 4" x 3/4" 37.42$ 41.00$ 37.94$ 42.69$ 38.82$ 4" x 1" 37.42$ 41.00$ 37.94$ 42.69$ 38.82$ 4" x 2" 75.39$ 86.70$ 81.67$ 85.95$ 87.92$ 6" x 3/4" 55.84$ 60.06$ 56.59$ 63.70$ 57.92$ 6" x 1" 55.84$ 60.06$ 56.59$ 63.70$ 57.92$ 6" x 2" 105.36$ 113.32$ 105.67$ 120.20$ 109.30$ 8" x 3/4" 76.74$ 82.54$ 77.77$ 87.55$ 79.61$ 8" x 1" 76.74$ 82.54$ 77.77$ 87.55$ 79.61$ 10" x 3/4" 148.05$ 159.25$ 150.00$ 168.91$ 152.00$ 10" x 1" 148.05$ 159.25$ 150.00$ 168.91$ 152.00$ 2" Ford Setter w/ball valve, w/check valve & bypass (A) 1,182.13$ 1,271.59$ 1,185.00$ 1,360.13$ 1,213.80$ 2" Ford Setter w/ball valve, w/check valve & bypass (B) 1,220.12$ 1,312.45$ 1,222.25$ 1,403.84$ 1,252.80$ 17" x 30" plastic meter box 18" 176.73$ 248.04$ 178.72$ 328.69$ No bid 15" concrete meter box w/C1 reader flip lid No bid 50.21$ 53.50$ 49.18$ 43.75$ 1" Ford meter yoke 10" rise w/double check valve w/locking ball valve 341.44$ 367.28$ 329.75$ 392.85$ 361.40$ Octave Meters: 2" Octave Meter No bid No bid 1,897.50$ No bid No bid 3" Octave Meter No bid No bid 2,350.00$ No bid No bid 4" Octave Meter No bid No bid 3,136.00$ No bid No bid 6" Octave Meter No bid No bid 4,850.00$ No bid No bid 2" Octave Meter No bid No bid no bid No bid No bid 3" Octave Meter No bid No bid no bid No bid No bid 4" Octave Meter No bid No bid no bid No bid No bid 6" Octave Meter No bid No bid no bid No bid No bid 3G DS Encoder XTR 199-004-50 No bid No bid 158.00$ No bid No bid 3G DS Encoder Module 965-010-16 No bid No bid 195.00$ No bid No bid DLG 3G DS Fast Pulse DLG 199-004-57 No bid No bid 170.00$ No bid No bid Octobe Double Pulse Output ADA 965-010-19 No bid No bid 285.00$ No bid No bid Badger Meters: Badger, M25, 5/8" X 3/4" Disc Meter No bid No bid No bid No bid No bid Badger M55, 1" Disc Meter No bid No bid No bid No bid No bid Badger M120, 1-1/2" Disc Meter No bid No bid No bid No bid No bid Badger, M170, 2" Disc Meter No bid No bid No bid No bid No bid Badger, 2" T-200 Turbo Series Meter No bid No bid No bid No bid No bid Badger, 3" T-450 Turbo Series Meter No bid No bid No bid No bid No bid Badger, 4" T-1000 Turbo Series Meter No bid No bid No bid No bid No bid Badger, 6" T-2000 Turbo Series Meter No bid No bid No bid No bid No bid Badger, 2" Compound Series Meter, No bid No bid No bid No bid No bid Badger, 3" Compound Series Meter No bid No bid No bid No bid No bid Badger, 4" Compound Series Meter No bid No bid No bid No bid No bid Badger, 6" Compound Series Meter No bid No bid No bid No bid No bid Tires & Installation CRO #1687 3/20/2026 2 p.m. CDT Shadden Tire Best One Josh Martin Auto Repair Passenger and light truck tires 18.99$ 26.50$ 15.00$ Medium truck tires 35.00$ 42.00$ 15.00$ Medium truck tires with Dayton wheels 35.00$ 48.00$ 15.00$ Industrial tires up to 16.5" wheel 20.00$ 34.00$ 29.99$ Industrial tires greater than 16.5" wheel 20.00$ 39.00$ 29.99$ Annual pump and motor maintenance CRO #1691 3/20/2026 2 p.m. CDT John Bouchard SW Services Shop Service - Standard Hourly Rate 125.00$ 165.00$ Shop Service - OT Rate 187.50$ 247.50$ Delivery Free $200/hr Crane Free Price varies

Document text

BIDS WILL BE AWARDED ON 4-14-26 AND PRICE 
CONTRACTS SENT AFTER APPROVAL. LOW BID DOES 
NOT GUARANTEE SELECTION. 
BULK COARSE SALT
CRO #1683
3/20/2026
2 p.m. CDT
Salt
F.O.B.
Salt
Picked up
Sodium
Chloride F.O.B.
Sodium
Chloride
Picked up
Morton Salt Inc No bid No bid 149.36$                   149.00$                       
Compass Minerals No bid No bid No bid No bid
Univar No bid No bid No bid No bid
Dycho Company No bid No bid No bid No bid
Water Treatment Chemicals
CRO #1685
3/20/2026
2 p.m. CDT
ZINC-ORTHO SODIUM SODIUM SODIUM NORIT
VENDOR CAUSTIC CAUSTIC PHOSPHATE FLUROSILICIC BICARBONATE GRANULAR SALT COAGULANT PERMANGANATE THIOSULFATE PAC
(GAL)-50% (GAL)-25% (GAL) ACID (GALLON) (POUND) BULK (POUND) (GALLON) Tote (GALLON) (POUND)
Univar Solutions. 4.7574$             No bid No bid 3.9000$                       0.5920$             0.1775$                 No bid 10.4100$               3.8730$            No bid
Shannon Chemical Corp. No bid No bid 9.17$                       No bid No bid No bid No bid 14.1400$               No bid No bid
Carus Corporation No bid No bid 9.0200$                   No bid No bid No bid No bid No bid No bid No bid
Chemrite Inc No bid No bid 7.6500$                   No bid No bid No bid No bid 10.4400$               No bid No bid
Brenntag Mid-South 3.6000$             No bid 16.5000$                 No bid 0.3499$             0.1749$                 No bid 13.6100$               No bid No bid
Dycho Company Inc 3.7500$             No bid 9.4100$                   3.8800$                       0.3600$             0.1775$                 4.4400$        11.1000$               3.4900$            1.1800$ 
Hawkins Inc 3.5400$             No bid No bid 5.3700$                       No bid No bid No bid 10.4400$               8.2200$            No bid
United Mineral No bid No bid No bid No bid No bid No bid No bid 13.7700$               No bid No bid
Thermadyne No bid No bid No bid No bid No bid No bid 5.3850$        No bid No bid No bid
** LOOK AT THE BID FOR NOTES FROM BIDDER
Fertilizer
CRO #1686
3/20/2026
2 p.m. CDT
Site One Landscape Supply - Knoxville
Quantity Bag Ton
07/01/2026 Delivery
LESCO 33-0-3 50% U-PLUS BIO 2Fe 50# 90 $28.5820 2,572.38$                
 (Alt. for 33-3-5 no longer available) -$                        
LESCO 32-0-8 40% NOS PLUS BIO 2Fe 50# 74 $28.8670 2,136.16$                
(Alt. for 32-3-8) -$                        
Fertilizer/Insecticide 0-0-7 plus Acelepryn 0.067% 105 $37.6980 3,958.29$                
LESCO 18-24-12 25% NOS PLUS BIO 50# 130 $29.5460 3,840.98$                
(Alt. for 18-24-12 25% SCU) -$                        
03/01/2027 Delivery -$                        
Dimension .15% 19-0-6 30% Polyplus LESCO 148 $31.8070 4,707.44$                
(Alt. for 19-0-6 with .15 dimension) -$                        
21-0-0 AS Mpac Compacted SGN 170 95 $34.5180 3,279.21$                
Fertilizer/Insecticide 0-0-7 plus Acelepryn 0.067% 105 $37.6980 3,958.29$                
05/03/2027 Delivery -$                        
Dimension .15% 19-0-6 30% Polyplus LESCO 153 $31.8070 4,866.47$                
(Alt. for 19-0-6 with .15 dimension) -$                        
Fertilizer 5-10-31 A/C with 10% FE 50 $16.1190 805.95$                   
LESCO 33-0-3 50% U-PLUS BIO 2Fe 50# 90 $28.5820 2,572.38$                
 (Alt. for 33-3-5 no longer available)
32,697.55$              
The Hogan Company 
7/1/2026 Quantity Bag Ton
TFC MTO 35-3-5 FERTILIZER 50LB 90 $23.82 2,143.80$                
TFC MTO 32-3-8 30% SCU 2% FE FERT. 50LB 74 $28.19 2,086.06$                
Lebabon Pro 0-0-7 .067% Acelepryn MOP SNG 220 105 $36.88 3,872.40$                
TFC MTO 18-24-12 Starter Fert. 25% SCU 130 $27.56 3,582.80$                
3/1/2027
Lebabon Pro 17-0-0 0.15% Dimension 50LB 148 $34.03 5,036.44$                
21-0-0 Ammonium Sulfate Fert. SGN 220 50LB 95 $20.06 1,905.70$                
Lebabon Pro 0-0-7 .067% Acelepryn MOP SNG 220 105 $36.88 3,872.40$                
5/3/2027
Lebabon Pro 17-0-0 0.15% Dimension 50LB 153 $34.03 5,206.59$                
TFC MTO 5-10-31 10% fe SNG 220 50LB 50 $23.50 1,175.00$                
TFC MTO 35-3-5 FERTILIZER 50LB 90 $23.82 2,143.80$                
TOTAL 31,024.99$              
Pest Control
CRO #1688
3/20/2026 2 p.m.
Prices per Treatment
Bug Busters Dodson Smithereen Pest
City Hall 65.00$               65.00$                    39.00$                     
Police Department 65.00$               50.00$                    39.00$                     
Fire Department 65.00$               55.00$                    39.00$                     
Recreational Buildings 65.00$               55.00$                    39.00$                     
Palace Theater 65.00$               55.00$                    39.00$                     
Crossville Depot 65.00$               55.00$                    39.00$                     
WTP - 105 Holiday Drive 65.00$               55.00$                    39.00$                     
WTP - 963 City Lake Rd 65.00$               55.00$                    39.00$                     
Public Works:
Maintenance Dept. and Bays 65.00$               20.00$                    39.00$                     
Street Dept. and Kitchen 65.00$               20.00$                    39.00$                     
Public Works Office and Kitchen 65.00$               20.00$                    39.00$                     
Utilities Maintenance and Kitchen 65.00$               20.00$                    39.00$                     
Fire Station #2 65.00$               55.00$                    39.00$                     
Meadow Park Lake Office 65.00$               55.00$                    39.00$                     
Airport Terminal Building 65.00$               55.00$                    39.00$                     
Veolia 65.00$               55.00$                    39.00$                     
Cemetery Building 65.00$               55.00$                    39.00$                     
PD Impound Lot Buidling 65.00$               55.00$                    39.00$                     
SEASONAL TREATMENTS:
Centennial Park Concessions Buildings and Restrooms 65.00$               55.00$                    39.00$                     
Meadow Park Lake Bath House 65.00$               20.00$                    39.00$                     
Meadow Park Lake 
Maintenance Storage 65.00$               20.00$                    39.00$                     
Duer Soccer Complex 65.00$               55.00$                    39.00$                     
Garrison Park 65.00$               55.00$                    39.00$                     
MONTHLY TOTAL 1,495.00$          1,060.00$               897.00$                   
Street Striping
CRO #1689
3/20/2026 2 p.m.
4" line (per foot) 0.11$                 
6" line (per foot) 0.16$                 
Thermoplastic:
24" Stop Bar (per foot) 15.00$               
12" crosswalk (per foot) 25.00$               
Turn/straight arrows (each) 350.00$             
4" white or yellow line (per foot) 0.80$                 
Rumble strips (per foot) 8.00$                 
Word message (per letter) 35.00$               
Cold Milling
CRO #1690
3/20/2026
2 p.m. CDT
Per ton to 
remove and 
retain millings
Per ton for City to 
retain millings and 
have delivered
Rogers Group 36.00$               35.00$                    
Water Line Supplies
CRO# 1684
3/20/2026
2 p.m. CDT
Core & Main G&C Supply Co
 Consolidated Pipe 
& Supply 
Furguson 
Waterworks
Fortiline 
Waterworks
Saddles (Smith Blair)
2" x 3/4" cc 30.21$               26.94$                    17.95$                     30.83$                         31.33$               
2" x 1" cc 30.21$               26.94$                    17.95$                     31.49$                         31.33$               
3" x 3/4" cc 32.63$               32.06$                    21.38$                     30.83$                         33.84$               
3" x 1" cc 32.63$               32.06$                    21.38$                     38.00$                         33.84$               
3" x 2" I.P.T. 39.76$               45.09$                    29.95$                     50.39$                         41.25$               
4" x 3/4" cc 41.71$               36.38$                    30.15$                     39.64$                         40.10$               
4" x 1" cc 41.71$               36.38$                    30.15$                     39.64$                         40.10$               
4" x 2" I.P.T. 44.44$               47.48$                    39.35$                     53.21$                         46.10$               
6" x 3/4" cc 42.92$               39.63$                    34.28$                     44.57$                         44.52$               
6" x 1" cc 42.92$               39.63$                    34.28$                     44.57$                         44.52$               
6" x 2" I.P.T. 52.28$               50.22$                    39.29$                     56.90$                         54.23$               
8" x 3/4" cc 46.98$               50.85$                    43.98$                     50.22$                         48.67$               
8" x 1" cc 46.98$               50.85$                    43.98$                     50.22$                         48.67$               
8" x 2" I.P.T. 58.62$               62.82$                    47.98$                     69.42$                         60.81$               
10" x 3/4" cc 57.15$               65.10$                    48.55$                     67.60$                         59.29$               
10" x 1" cc 57.15$               65.10$                    47.37$                     67.60$                         59.29$               
10" x 2" I.P.T. 73.75$               82.86$                    55.78$                     93.31$                         76.51$               
12" x 3/4" cc 61.34$               78.08$                    52.57$                     85.43$                         62.97$               
12" x 1" cc 61.34$               78.08$                    52.57$                     85.43$                         62.97$               
12" x 2" I.P.T. 77.74$               97.50$                    65.63$                     110.29$                       79.81$               
14" x 3/4" cc 72.44$               112.66$                  106.21$                   97.87$                         62.97$               
14" x 1" cc 72.44$               112.66$                  106.21$                   99.93$                         62.97$               
14" x 2" I.P.T. 88.24$               144.38$                  97.20$                     121.72$                       79.81$               
16" x 3/4" cc 85.98$               114.19$                  109.08$                   118.60$                       88.27$               
16" x 1" cc 85.98$               114.19$                  109.08$                   118.60$                       88.27$               
16" x 2" I.P.T. 106.50$             156.47$                  110.60$                   146.91$                       109.35$             
Encoder module with Itron 5' cable Part#965-110-66 No bid No bid 161.00$                   No bid No bid
Corp Stops (Ford) ¾” F1000-3-Q NL 38.40$               42.06$                    37.15$                     42.99$                         33.86$               
Corp Stops (Ford) ¾” FB1000-3-Q NL, 300 PSI 56.81$               61.67$                    54.00$                     63.23$                         58.32$               
Coupling for ¾” service tubing brass C44-33-Q CRSXCTS NL 21.44$               23.27$                    20.75$                     23.98$                         22.01$               
3/4" PE Municipex CTS Service Tubing 500' coils (per ft) 1.02$                 465.00$                  $       440.00 (.88/ft) 424.13$                       .77/ft
1" PE Municipex CTS Service Tubing 500' coil (per ft) 1.53$                 700.00$                  $     640.00 (1.28/ft) 615.79$                       1.16/ft
Smith Blair 3/4" x 3" full circle clamp for service tubing 22.50$               30.31$                    19.71$                     10.53$                         No bid
18" plastic meter box (Carson-Brooks) plastic lid 53.21$               61.33$                    57.45$                     48.95$                         58.00$               
3/4" Meter yokes (Ford) 7" rise 200.98$             216.18$                  195.00$                   192.46$                       206.36$             
Brass Saddles (Ford)
2" x 3/4" 24.10$               26.40$                    30.29$                     27.49$                         25.00$               
2" x 1" 24.10$               26.40$                    30.29$                     27.49$                         25.00$               
4" x 3/4" 37.42$               41.00$                    37.94$                     42.69$                         38.82$               
4" x 1" 37.42$               41.00$                    37.94$                     42.69$                         38.82$               
4" x 2" 75.39$               86.70$                    81.67$                     85.95$                         87.92$               
6" x 3/4" 55.84$               60.06$                    56.59$                     63.70$                         57.92$               
6" x 1" 55.84$               60.06$                    56.59$                     63.70$                         57.92$               
6" x 2" 105.36$             113.32$                  105.67$                   120.20$                       109.30$             
8" x 3/4" 76.74$               82.54$                    77.77$                     87.55$                         79.61$               
8" x 1" 76.74$               82.54$                    77.77$                     87.55$                         79.61$               
10" x 3/4" 148.05$             159.25$                  150.00$                   168.91$                       152.00$             
10" x 1" 148.05$             159.25$                  150.00$                   168.91$                       152.00$             
2" Ford Setter w/ball valve, w/check valve & bypass (A) 1,182.13$          1,271.59$               1,185.00$                1,360.13$                    1,213.80$          
2" Ford Setter w/ball valve, w/check valve & bypass (B) 1,220.12$          1,312.45$               1,222.25$                1,403.84$                    1,252.80$          
17" x 30" plastic meter box 18" 176.73$             248.04$                  178.72$                   328.69$                       No bid
15" concrete meter box w/C1 reader flip lid No bid 50.21$                    53.50$                     49.18$                         43.75$               
1" Ford meter yoke 10" rise w/double check valve w/locking 
ball valve 341.44$             367.28$                  329.75$                   392.85$                       361.40$             
Octave Meters:
2" Octave Meter No bid No bid 1,897.50$                No bid No bid
3" Octave Meter No bid No bid 2,350.00$                No bid No bid
4" Octave Meter No bid No bid 3,136.00$                No bid No bid
6" Octave Meter No bid No bid 4,850.00$                No bid No bid
2" Octave Meter No bid No bid no bid No bid No bid
3" Octave Meter No bid No bid no bid No bid No bid
4" Octave Meter No bid No bid no bid No bid No bid
6" Octave Meter No bid No bid no bid No bid No bid
3G DS Encoder XTR 199-004-50 No bid No bid 158.00$                   No bid No bid
3G DS Encoder Module 965-010-16 No bid No bid 195.00$                   No bid No bid
DLG 3G DS Fast Pulse DLG 199-004-57 No bid No bid 170.00$                   No bid No bid
Octobe Double Pulse Output ADA 965-010-19 No bid No bid 285.00$                   No bid No bid

AI Analysis

Validation: Hybrid score 31 (confidence 79)

Contract Type
Estimated Value
Bid Bond
Site Visit
Local Req
License
Construction
PLC Details
HMI/SCADA
Comms
Subcontractor
Pre-selected

Related

Similar RFPs

Bid Postings • Engineering Services - Stormwater Lift Statio

IL · Score 67

View

GPSD 2942: PLC-7 & 8 Replacement

IL · Score 67

View

WASTEWATER FLOWMETERS REPLACEMENT AT WAUKEGAN WATER RECLAMATION FACILITY

IL · Score 60

View

MWRD - 21-0192-3P - Battery E Activated Sludge Facility OWRP - Dewatering

IL · Score 60

View

2026 Eastside Wastewater Plant Final Clairifiers 1-3 Reconditioning

IL · Score 60

View

Packages

Related Bid Packages