BidTron logo BidTron
Login Register

OH

EB-2504-R Rebid - Easterly Chemically Enhanced High-Rate Treatment Facility, Ohio.

H2Bid

Score: 53 Validated: yes
Published
Unknown
Due
2026-06-12
Contact
Category flags
None

Summary

back to CSO 001; a Diversion Structure; a Drain pump station with drainage pumps, sludge collection and pumping systems,

AI Analysis

Validation: Hybrid score 53 (confidence 85)

Contract Type
Estimated Value
Bid Bond
Site Visit
Local Req
License
Construction
PLC Details
HMI/SCADA
Comms
Subcontractor
Pre-selected

Project insights

{
  "bid_bond_required": null,
  "communication_details": null,
  "construction_beyond_panels": null,
  "contract_type": null,
  "estimated_project_value": null,
  "hmi_details": null,
  "integrators_already_selected": null,
  "integrators_required_local": null,
  "license_requirements": null,
  "mandatory_site_visit": null,
  "plc_details": null,
  "requires_subcontractor": null
}

Related

Similar RFPs

WWTP Improvements,Ohio.

OH · Score 80

View

57-26 - L & M Necessary to Repair, Maintain and Upgrade the Supervisory Control & Data Control Acquisition ( scada ) System,Ohio.

OH · Score 76

View

scada Radio Improvements,Ohio.

OH · Score 72

View

Pleasant Valley pump station and Ground Storage Tank,Ohio.

OH · Score 60

View

Wastewater Treatment Plant Headworks and Equalization Basin Design,Ohio.

OH · Score 59

View