Pipeline
All opportunities
Filters apply instantly. Status counts are based on the current filters.
57-26 - L & M Necessary to Repair, Maintain and Upgrade the Supervisory Control & Data Control Acquisition ( scada ) System,Ohio.
and Upgrade the Supervisory Control & Data Control Acquisition ( scada ) System,City of Cleveland, Ohio. An emergency ordinance authorizing the purchase
SCADA & Telemetry Consulting and On-Call Services
SCADA & Telemetry Consulting and On-Call Services Utah Calendar Published 06/08/2026 Clock Closing 06/26/2026
Engineering Services for Replacing Supervisory Control and Data Acquisition ( scada ),Iowa.
Engineering Services for Replacing Supervisory Control and Data Acquisition ( scada ),City of Ames,Iowa. Project Description:The City of Ames (hereinafter referred to
Road Pump Station MCC Improvements,Illinois.
new panelboards and ground mounted transformer.• Consolidation of existing scada system components into a new control cabinet.• Removal and
26-0137 Job Order Contracting – Water & Wastewater Services,Arizona.
electrical service, fiber, security systems, lighting and instrumentation systems, scada and controls, and mechanical systems; asphalt overlay and pavement
Spencer RC RTU Replacement
Spencer RC RTU Replacement Iowa Calendar Published 06/02/2026 Clock Closing 07/08/2026
Contract 1-2026 Supervisory Control and Data Acquisition Modifications, Iowa.
11, 2026, at 2 P.M. at City of Eldora wastewater Treatment Plant, 210 14th Street, Eldora, IA 50627. Closing Date
WWTP UV Disinfection Conversion,Illinois.
to render complete and fully functional electrical, mechanical, and scada systems.Full time superintendence.Installation and maintenance of erosion control measures,
Oasis Surface Water Treatment Plant 2026 Improvements, Arizona.
conveyed to the distribution system via a finished water pump station that pumps water to Pressure Zones 1 and
WS90100092 91st Avenue wastewater Treatment Plant Electrical, Instrumentation And Control Systems Inspection And Testing Engineering Services, Arizona.
WS90100092 91st Avenue wastewater Treatment Plant Electrical, Instrumentation And Control Systems Inspection And
Wastewater Treatment Plant Upgrade FY22,Idaho.
buildingand sludge storage. The project additionally includes several supporting pump station facilities and off-site water main extension.Closing Date:- June
RFPs and Grants — Town of Carrizozo
RFPs and Grants — Town of Carrizozo 0 Skip to Content Home About Carrizozo Departments Town Hall Airport Fire Department Library Police Department Public Works Parks and Recreation Evergreen Cemetery Industrial Park Governance Elected Offic…
Emergency Warning System Automated Command & Control System
Emergency Warning System Automated Command & Control System Missouri Calendar Published 05/15/2026 Clock Closing 06/10/2026
Wastewater Treatment Plant Improvements,Illinois.
labor, materials, and equipment required to construct a terminal lift station and force main, mechanical fine screen equipment and
I-70 and SR49 Interchange Sewer Extension,Illinois.
The project also includes the construction of a new lift station at the southeast corner of the property. The
Minton Road Lift Station Replacement Project
P2A Pump Station Rehabilitation Project
P2A Pump Station Rehabilitation Project Nevada Calendar Published 05/27/2026 Clock Closing 06/24/2026
Pleasant Valley pump station and Ground Storage Tank,Ohio.
Pleasant Valley pump station and Ground Storage Tank,City of Cleveland,Ohio. The City of
Design Services for Water Treatment Facility Expansion & Renovation
Design Services for Water Treatment Facility Expansion & Renovation Illinois Calendar Published 06/05/2026 Clock Closing 07/01/2026
Page 1 of 5 (88 total)